株式会社東海・ビルド - リフォームや注文住宅は名古屋の東海・ビルドにお任せください。

スタッフブログ

2022-01-30

Southern Water Building Control Protocol Agreement

The Southern Water Building Control Protocol Agreement is an essential document that outlines the requirements and procedures to be followed when constructing or renovating buildings in the South of England. As a professional, I will provide insights into what this agreement entails and its significance.

Firstly, it is important to understand the role of building control in the construction industry. Building control is responsible for ensuring that buildings are constructed or modified in compliance with the building regulations. It involves assessing plans, carrying out site inspections, and providing advice to developers, architects, and builders on how to meet the necessary standards.

The Southern Water Building Control Protocol Agreement is an agreement between Southern Water and the relevant local authority building control departments. The purpose of the agreement is to ensure that building works do not cause any damage to Southern Water’s sewer systems and that the systems remain functional when the works are complete.

The agreement applies to all building projects that involve excavations, such as foundation works, basement constructions, and landscaping. The agreement sets out the procedures that developers, architects, and builders must follow to protect Southern Water’s assets. This includes submitting plans for approval before works commence, providing plans of the works, and obtaining consent from Southern Water before excavations take place.

The agreement also includes information on the type of sewer systems that developers must connect to, the requirements for sewer connections, and the responsibilities of developers, architects, and builders in ensuring that Southern Water’s systems are not damaged during works.

The Southern Water Building Control Protocol Agreement is significant because it ensures that building works are carried out in a safe and environmentally friendly manner. It also protects Southern Water’s assets, which are essential for the effective functioning of the sewer systems. Failure to comply with the agreement can result in legal action, delays, and additional costs.

In conclusion, the Southern Water Building Control Protocol Agreement is an important agreement that all developers, architects, and builders must be aware of when carrying out building works in the South of England. Complying with the agreement is essential for the safe and environmentally friendly construction of buildings, as well as the protection of Southern Water’s assets. As a professional, I hope this article has provided valuable insights into this important agreement.

メニュー

バックナンバー

株式会社 東海・ビルド 品格ある技術力を追求し続ける総合建設業

フリーコール 0120-152-421 フリーコール 0120-152-421
営業時間 
9:00〜18:00

本社 本社

〒465-0008 
名古屋市名東区猪子石原一丁目1307
TEL:052-772-9100 
FAX:052-772-9158
建設業許可番号:
愛知県知事許可(特-2)第49209号
宅地建物取引業:
愛知県知事許可(5) 第18792号

東海・ビルド一級建築士事務所

一級建築士事務所
愛知県知事登録(い-5)第11697号

採用情報 採用情報

相談室 相談室

ビルド建築設計室 /
アーキビルド株式会社
〒465-0008 
名古屋市名東区猪子石原一丁目1307 
TEL:052-772-2421 
FAX:052-772-9121
建設業許可番号 愛知県知事許可(般-4)
110758号
一級建築士事務所 愛知県知事登録(い-3)
第14037号